Country: Pakistan
Location within country: FATA/KPK
Approx. value of the contract (in current US$):
US$ 325,581
Duration of assignment (months): 5 m
Name of Client: USAID
Start date (month/year): Aug 2011
Completion date (month/year): Dec 2011
Narrative description of Project:
The project scope required AiD to monitor physical Infrastructure and scholarship activities being implemented by lower FATA Development Program- Livelihood Development (FDP – LD) in FATA and KPK. Geographically, the infrastructure component covered; North and South Waziristan, Kurram Agency, Orakzai Agency as well as FRs Kohat, D.I.Khan, Lakki Marwat, Bannu, and Tank. Sectorally, the infrastructure program covered roads, irrigation, buildings and water supply. The scholarship program covered 120 institutions in the entire KPK/FATA and Punjab.
Description of actual services provided in the assignment:
Infrastructure:
Periodic assessments of all infrastructure sub-components (water supply, sanitation and drainage , link roads etc) through; i) review of design and specifications, ii) physical inspections, iii) quality control checks, iv) material tests, v) review of construction schedules, vi) assessment of project benefits and technical guidance on need basis Monthly reports covering detailed assessment and recommendations for the Infrastructure component.
Services included;
- Conducting necessary field visits, topographic surveys (providing as-built situation with all utilities and relevant information), Geo-technical investigations and tests
- Detailed designing and supervision of water sanitation & hygiene (wash) component
Looking to start a project or need expert consultation?
Connect with our team for strategic, results-driven solutions tailored to your goals across development, engineering, and environmental domains.