Narrative description of Project:

The project scope includes the planning, design, construction supervision and evaluation of water supply and sanitation schemes in Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

  •  Conducting necessary field visits, topographic surveys
  •  Detailed water supply and sanitation schemes designs
  •  Preparation of PC-I/Cost estimates
  •  Preparation of bidding documents and technical support during evaluation
  •  Construction supervision and contract monitoring with reference to client brief and approved engineering designs
  •  Verification of contractor bills, work schedule etc
  •  Submission of progress reports/Completion reports

Start Date: 

2014 to 2015

Approx. value of the contract: 

US$ 533,333

Location: 

  • Khyber Pakhtunkhwa

Name of Client: 

  • Public Health Engineering Department KPK (Pakistan)

Duration of assignment (months): 

18

Person-months of the assignment: 

156

Name of senior regular full time employees: 

  • Team Manager (Farooq Khan)
  • Structural Engineer (Naveed Iqbal)
  • QA/QC Engineer (Malik Ahsan Gulzar)
  • Design Engineer (Haris Sheikh)
  • Cad Manager (Saqib Kamran)
  • Resident Engineer (Zia ud din)
  • Assistant Resident Engineer
  • Quantity /Quality Surveyor
  • Land Surveyor
  • Site Engineer
  • Sub Engineers