Feasibility Study and Design of Water Supply and Sanitation Schemes under ADP 2013-14, Mardan/Sawabi Region

Feasibility Study and Design of Water Supply and Sanitation Schemes under ADP 2013-14, Mardan/Sawabi Region

Project Category: 

Status: 

Narrative description of Project:

The project scope includes the planning, design, construction supervision and evaluation of water supply and sanitation schemes in Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

  •  Conducting necessary field visits, topographic surveys
  •  Detailed water supply and sanitation schemes designs
  •  Preparation of PC-I/Cost estimates
  •  Preparation of bidding documents and technical support during evaluation
  •  Construction supervision and contract monitoring with reference to client brief and approved engineering designs
  •  Verification of contractor bills, work schedule etc
  •  Submission of progress reports/Completion reports

Name of Client: 

  • Public Health Engineering Department KPK (Pakistan)

Project Duration/ Timeline: 

January 2014 to June 2015

Approx. value of the contract: 

US$ 251,428 /PKR 38,880,000

Location: 

  • Peshawar